8" POLYBUTENE
OIL FREEZE SEAL California Department of Water Resources
contracted our service department to assist them with the
repair of (3) Leaking Electrical Transformer Potheads. The
project was located at the Edward Hyatt Hydro Power Plant
more than 200 feet under Lake Orville. Our critical part of
the project involved producing a dependable and safe single
freeze plug stop on a 8.0" (3) 230KV SS Cable Pipe full of
Polybutene Electrical Oil .
|
|
|
12" CONDENSER WATER
FREEZE SEAL Due to the malfunction of supply side
block valve this project required our service department to
freeze plug a 12" condenser water pipe immediately off the
outlet side of the #3 pump. The client, a major resort hotel
needed our CRYO-LATOR™ Freeze Plug Procedure to hold back
approximately 300 lbs of head pressure in an elevated run of
50 stories while the pump was rebuilt in place. |
|
|
12" DUCTILE WATER
MAIN FREEZE
SEAL
CRYOSTOP
Pipe Freezing was recently called on to provide a critical
freeze plug isolation for the city of Bellevue,
Washington. The project required CRYOSTOP
to provide a freeze plug isolation on an underground
12" ductile iron water main. The System was operating
80 PSI / 42°F. |
|
|
DOUBLE 24"
SIMULTANEOUS
FREEZE SEALS
This project was performed
in the summer months at a major Medical Center in the
Washington, DC and involved the simultaneous freeze seals of
(2) 24” Supply & Return Chill Water Pipes. The contractor
needed to change out both the old Supply & Return Block
Valves. The freeze seal project went perfect with no
problems. |
|
|
(8) 8.0"
CONDENSER WATER FREEZE
SEALS
CRYOSTOP
International Pipe Freeze Services was contracted to
perform (8) individual critical freeze plugs at the main
Bellevue, WA Boeing Computer Center. The project involved
changing out, without shutting down (8) 8" cooling water
risers/block valves to the condenser cooling towers. The
project was extremely critical and the non-interruptive
operation of the Boeing Worldwide Computer System was
dependant on this cooling system. |
|
|
8.0" Close Mechanical
Pipe Plug This project involved our Mechanical Line
Plugging System. Our customer called on CRYOSTOP
International Pipe Freeze Services to provide them with a
dependable pipe freeze plug on a 8.0" steel chill water
pipe. However during the project evaluation process it was
determined that the 8.0" pipe did not have enough length to
establish a dependable and safe freeze plug. For this and
other special applications where a freeze plug cannot be
safely established we have the capabilities to perform mechanical
line stops. Please see the linked pictures. |
|
|
8.0" Close Mechanical
Pipe Plug This project involved our Mechanical Line
Plugging System. Our customer called on CRYOSTOP
International Pipe Freeze Services to provide them with a
dependable pipe freeze plug on a 8.0" steel chill water
pipe. However during the project evaluation process it was
determined that the 8.0" pipe did not have enough length to
establish a dependable and safe freeze plug. For this and
other special applications where a freeze plug cannot be
safely established we have the capabilities to perform mechanical
line stops. Please see the linked pictures. |
|
|
CM / NUEMTI - Details Coming
Soon
Complex Multi- Hot Water Freeze Plug
Project In Major NE Medical Center |
|
|
CM / NUEMTI - Details Coming
Soon
Complex Multi- Hot Water Freeze Plug
Project In Major NE Medical Center |
|
|
CM / NUEMTI - Details Coming Soon
Sister Company to Expand Services |
|
|
CM / NUEMTI - Details Coming Soon
Sister Company to Expand Services |
|
|
|
|
|
NEWS
CM / NUEMTI - Service / Affiliate Locations Coming Soon |
|
|
|
|
| |
|